SpeedtestsModelleBenchmarksVermietungenBerichteHardwareDecode-RechnerOrganisationenProAPI-DokuEinreichen
Sprache
Actual Computer — Every computer, one endpoint

Speedtest

Qwen3.6-35B-A3B-GGUF

B200 192GB · llama.cpp · b74a7c89 (74a7c89, 2026-09-05) · Unsloth-Dynamic-Q4_K_M

gpu-rentalsVerifiziert06.09.2026Verifizierter Lauf

Decode

200tok/s

Prefill

1.6ktok/s

Zeit bis zum ersten Token

187ms

Gesamt

250tok/s

Peak-VRAM

21,7GB

Kontextlänge

32K

KV-Tiefe

0

Batchgröße

1

Parallelität

1

Leistungsaufnahme

344W

Verifizierung

Verifizierter Lauf

Startbefehl

llama-server -m Qwen3.6-35B-A3B-UD-Q4_K_M.gguf -c 32768 -ngl 99 -fa on -np 1 --no-mmap --jinja --reasoning-format none --host 127.0.0.1 --port 8080

Theoretical memory ceiling

3,934.7–3,946.7 tok/s

8,000 GB/s memory bandwidth (spec sheet) · 22.13 GB model weights · 16-bit KV cache · 1–303 tokens of context

5–5%

of the ceiling reached

High confidence

The fastest this hardware's memory could serve a single request; real runs are slower. Model details from Qwen/Qwen3.6-35B-A3B; size from unsloth/Qwen3.6-35B-A3B-GGUF/Qwen3.6-35B-A3B-UD-Q4_K_M.gguf. Hardware source · Open calculator

Hardware

GPU
B200
Anzahl
1
VRAM
192 GB
OS
Ubuntu 24.04.4 LTS

Engine

Engine
llama.cpp
Version
b74a7c89 (74a7c89, 2026-09-05)
Quant
Unsloth-Dynamic-Q4_K_M
Backend
cuda
GPU layers
99
Flash Attn
ja

Run-Konfiguration

Kontext
32.768 Tokens
Tiefe
0 Tokens
Batch-Größe
1
Prompt-Tokens
303
Prefill tok/s
1,618.1 tok/s
Leistungsaufnahme
344 W
Output-Tokens
1024
Notizen
Rented 1x NVIDIA B200 (179 GB) on Lium (lium.io). llama.cpp commit 74a7c89 (2026-09-05) built from source with CUDA 13.0 for sm_100 (GGML_CUDA=ON, CMAKE_CUDA_ARCHITECTURES=100); llama-server -c 32768 -ngl 99 -fa on -np 1 --no-mmap --jinja --reasoning-format none; file Qwen3.6-35B-A3B-UD-Q4_K_M.gguf (22.1 GB). Batch 1, canonical LocalMaxxing reasoning-v1 prompt, greedy, max_tokens 1024, 2 warmups + 5 timed iterations (median). Cross-check llama-bench -n 256: 234.8 tok/s. Power = mean nvidia-smi power.draw over active samples of the timed window.

Erfasste Nachweise

Prompt-Hash (SHA-256)
9000edaadb16…
Prompt-Beispiel · 1,078 chars
You are helping a small robotics club plan a weekend build. Work through each part carefully and show your reasoning.

1. The club has 7 members and a budget of 412 dollars. A motor driver costs 18.50, a microcontroller 23.75, and each member wants one of each plus a shared 3D-printer spool at 27.90. After buying everything, they split the remainder evenly on batteries priced at 6.35 each. How many batteries can they buy in total, and how much money is left over?

2. Two members disagree about wheel size. Alice says a larger wheel gives more torque at the ground; Ben says it gives more speed. Explain who is right, what tradeoff is actually involved, and how gear ratio changes the answer.

3. Write a short, plain-English procedure (six to nine steps) for safely testing a new motor circuit for the first time, including what to check before applying power.

4. Finally, propose one creative feature for the robot that would be unusual for a club project, and give two concrete risks with how you would mitigate each.

Answer all four parts in order with clear headings.
Ausgabebeispiel · 3,133 chars
<think>
Here's a thinking process:

1.  **Analyze User Input:**
   - **Context:** Small robotics club planning a weekend build.
   - **Task 1 (Math/Word Problem):** 7 members, budget $412. Costs: motor driver $18.50, microcontroller $23.75. Each member wants one of each (so 7 motor drivers, 7 microcontrollers). Plus a shared 3D-printer spool at $27.90. After buying everything, split remainder evenly on batteries at $6.35 each. Find: total batteries bought, money left over.
   - **Task 2 (Physics/Engineering):** Alice vs. Ben on wheel size. Alice: larger wheel = more torque at ground. Ben: larger wheel = more speed. Explain who's right, the tradeoff, and how gear ratio changes it.
   - **Task 3 (Procedure):** 6-9 step plain-English procedure for safely testing a new motor circuit for the first time, including pre-power checks.
   - **Task 4 (Creative Feature):** Propose one unusual creative feature for the robot, give two concrete risks, and mitigation for each.
   - **Format:** Answer all four parts in order with clear headings.

2.  **Deconstruct & Solve Task 1 (Math):**
   - Budget: $412.00
   - Costs per person: Motor driver ($18.50) + Microcontroller ($23.75) = $42.25
   - For 7 members: 7 * $42.25 = $295.75
   - Shared spool: $27.90
   - Total initial cost: $295.75 + $27.90 = $323.65
   - Remainder: $412.00 - $323.65 = $88.35
   - Batteries cost: $6.35 each
   - Number of batteries: $88.35 / $6.35 = 13.913... -> They can buy 13 batteries (must be whole number)
   - Cost of 13 batteries: 13 * $6.35 = $82.55
   - Money left over: $88.35 - $82.55 = $5.80
   - Check: 13 * 6.35 = 82.55. 323.65 + 82.55 = 406.20. 412 - 406.20 = 5.80. Correct.
   - Wait, the prompt says "split the remainder evenly on batteries priced at 6.35 each." This phrasing is slightly ambiguous. Does it mean they divide the remainder by the number of members (7) to get per-person battery budget, then buy batteries? Or does it just mean they pool the remainder to buy batteries? "split the remainder evenly on batteries" likely just means they use the pooled remainder to buy batteries. I'll stick with the pooled remainder approach, as it's standard for club budgets. I'll clarify the calculation steps.
   - Let's double-check the exact wording: "After buying everything, they split the remainder evenly on batteries priced at 6.35 each." This could mean they divide the remainder by 7, then each buys batteries? But batteries are usually shared or per-robot. I'll assume pooled remainder for total battery count. I'll state the assumption clearly if needed, but the math is straightforward: remainder / battery price = max whole batteries.
   - Calculation: 412 - (7*18.50 + 7*23.75 + 27.90) = 412 - (129.5 + 166.25 + 27.90) = 412 - 323.65 = 88.35. 88.35 / 6.35 = 13.913. So 13 batteries. Leftover: 88.35 - (13*6.35) = 5.80.
   - I'll present the steps clearly.

3.  **Deconstruct & Solve Task 2 (Physics/Engineering):**
   - Question: Alice says larger wheel = more torque at ground. Ben says larger wheel = more speed. Who is right? Tradeoff? Gear ratio effect?
   - Physics: Torque at ground (τ_ground) = τ_motor * gear_ratio

Weitere Runs dieses Modells auf dieser Hardware

Noch keine weiteren freigegebenen Runs dieses Modells auf dieser Hardware.