Speed testsModelsBenchmarksRentalsReportsHardwareDecode calculatorOrganizationsProAPI DocsSubmit
Language
Actual Computer — Every computer, one endpoint

Speed test

NVIDIA-Nemotron-3.5-Lightning-30B-A3B-NVFP4

RTX PRO 6000 Blackwell 96GB · vllm · v0.28.0 · NVFP4

gpu-rentalsVerifiedSep 6, 2026Verified run

Decode

512tok/s

Prefill

10.0ktok/s

Time to first token

31ms

Total

657tok/s

Peak VRAM

86.7GB

Context length

32K

KV depth

0

Batch size

1

Concurrency

1

Power draw

305W

Verification

Verified run

Launch command

vllm serve /workspace/models/NVIDIA-Nemotron-3.5-Lightning-30B-A3B-NVFP4 --served-model-name nvidia/NVIDIA-Nemotron-3.5-Lightning-30B-A3B-NVFP4 --host 127.0.0.1 --port 8000 --max-model-len 32768 --max-num-seqs 128 --gpu-memory-utilization 0.90 --enable-prefix-caching --async-scheduling --mamba-backend flashinfer --mamba-ssm-cache-dtype float16 --speculative-config '{"method":"mtp","num_speculative_tokens":3}'

Theoretical memory ceiling

3,906.3–4,050.6 tok/s

1,792 GB/s memory bandwidth (spec sheet) · 16.50 GB model weights · 16-bit KV cache · 1–308 tokens of context

Includes speculative decoding: 3.39 tokens accepted per model step on average (1,152.0–1,194.5 steps/s) · measured 151.0 steps/s

13–13%

of the ceiling reached

Medium confidence

The fastest this hardware's memory could serve a single request; real runs are slower. Model details from nvidia/NVIDIA-Nemotron-3.5-Lightning-30B-A3B-NVFP4; size from NVFP4 estimate. Hardware source · Open calculator

Hardware

GPU
RTX PRO 6000 Blackwell
Count
1
VRAM
96 GB
OS
Ubuntu 24.04.4 LTS

Engine

Engine
vllm
Version
0.28.0
Quant
NVFP4
Backend
cuda
TP
1
GPU mem util
0.9
Prefix caching
yes
Max running seqs
128
Spec decode
enabled
MTP
enabled

Run config

Context
32,768 tokens
Depth
0 tokens
Batch size
1
Prompt tokens
308
Prefill tok/s
10K tok/s
Power draw
305 W
Output tokens
1024
Notes
Rented 1x NVIDIA RTX PRO 6000 Blackwell (96 GB) on Lium (lium.io), PyTorch CUDA Ubuntu 24.04 template. vLLM 0.28.0, torch 2.13.0+cu130, official NVIDIA NVFP4 checkpoint with its native MTP head as speculative decoder (vLLM speculative_config method mtp, num_speculative_tokens 3; lossless), canonical LocalMaxxing reasoning-v1 prompt, greedy, batch 1, max_tokens 1024, 2 warmups + 5 timed iterations (median). Power = mean nvidia-smi power.draw over active samples of the timed window.

Speculative decoding

Method
MTP
Accepted per step
3.39 tokens
Acceptance rate
80%
Draft tokens
906
Accepted tokens
722

Captured evidence

Prompt hash (SHA-256)
9000edaadb16…
Prompt sample · 1,078 chars
You are helping a small robotics club plan a weekend build. Work through each part carefully and show your reasoning.

1. The club has 7 members and a budget of 412 dollars. A motor driver costs 18.50, a microcontroller 23.75, and each member wants one of each plus a shared 3D-printer spool at 27.90. After buying everything, they split the remainder evenly on batteries priced at 6.35 each. How many batteries can they buy in total, and how much money is left over?

2. Two members disagree about wheel size. Alice says a larger wheel gives more torque at the ground; Ben says it gives more speed. Explain who is right, what tradeoff is actually involved, and how gear ratio changes the answer.

3. Write a short, plain-English procedure (six to nine steps) for safely testing a new motor circuit for the first time, including what to check before applying power.

4. Finally, propose one creative feature for the robot that would be unusual for a club project, and give two concrete risks with how you would mitigate each.

Answer all four parts in order with clear headings.
Output sample · 3,020 chars
Here's a thinking process:

1.  **Analyze the User's Request:**
   - The user starts with `[LocalMaxxing cache-bust nonce: f319be4ea4fd987d0e8a3cc9ec922edb]` - this looks like some kind of tracking/tracing tag, possibly from a tool or system. I should ignore it or note it but not let it affect the actual content.
   - The user wants help with 4 distinct parts for a robotics club weekend build.
   - I need to answer all 4 parts in order with clear headings.
   - Part 1: Math/word problem about budget, items, splitting remainder.
   - Part 2: Physics/engineering concept question about wheel size, torque vs speed, gear ratios.
   - Part 3: Write a short procedure (6-9 steps) for safely testing a motor circuit.
   - Part 4: Propose a creative feature for the robot, with two concrete risks and mitigations.

2.  **Part 1: Budget Problem**
   - Club has 7 members, budget $412.
   - Items: motor driver $18.50, microcontroller $23.75.
   - Each member wants one of each (so 7 motor drivers, 7 microcontrollers).
   - Plus a shared 3D-printer spool at $27.90.
   - After buying everything, split remainder evenly on batteries priced at $6.35 each.
   - Question: How many batteries can they buy in total, and how much money is left over?

   Let's calculate step by step:
   - Cost per member for motor driver + microcontroller = 18.50 + 23.75 = 42.25
   - For 7 members: 42.25 * 7 = 295.75
   - Shared spool: 27.90
   - Total spent on members + spool = 295.75 + 27.90 = 323.65
   - Remainder from budget: 412 - 323.65 = 88.35
   - Batteries cost $6.35 each.
   - How many batteries can they buy? floor(88.35 / 6.35) = ?
     - 6.35 * 10 = 63.50
     - 6.35 * 13 = 82.55
     - 6.35 * 14 = 88.90 (too much)
     - So max 13 batteries.
   - Cost of 13 batteries: 13 * 6.35 = 82.55
   - Money left over: 88.35 - 82.55 = 5.80
   - Wait, the problem says: "After buying everything, they split the remainder evenly on batteries priced at 6.35 each." This phrasing is a bit ambiguous. Does "split the remainder evenly on batteries" mean they use the remainder to buy as many batteries as possible, dividing evenly among members? Or does it mean they split the remainder *as* batteries evenly? Let's re-read: "After buying everything, they split the remainder evenly on batteries priced at 6.35 each. How many batteries can they buy in total, and how much money is left over?"
   - I think it means: With the remaining money, they buy batteries at $6.35 each, and they split those batteries evenly (or just buy as many as possible, and the leftover money is what's left). But the question asks: "How many batteries can they buy in total, and how much money is left over?" So I'll compute max batteries purchasable with remainder, and leftover money.
   - Let's double-check the math:
     - 7 * (18.50 + 23.75) = 7 * 42.25 = 295.75
     - + 27.90 = 323.65
     - 412 - 323.65 = 88.35
     - 88.35 / 6.35 = 13.913... → 13 batteries
     - 13 * 6.35 = 82.55
     - 88.35 - 82.55 = 5.80
   - So total batteries: 13, money left

More runs of this model on this hardware