速度テストモデルベンチマークレンタルレポートハードウェアデコード計算機組織ProAPIドキュメント送信
言語
Actual Computer — Every computer, one endpoint

速度テスト

MiniMax-M3.1-Flash

RTX PRO 6000 Blackwell Max-Q Workstation Edition 96GB ×4 · vllm · v0.1.dev23341+g8744dd2fb.d20261022.cu134 · NVFP4

puretensor検証済み2026/10/23検証済みラン

デコード

175tok/s

プリフィル

4.9ktok/s

最初のトークンまでの時間

93ms

合計

212tok/s

ピーク VRAM

—

コンテキスト長

256K

KV 深度

0

バッチサイズ

1

同時実行数

1

消費電力

—

検証

検証済みラン

起動コマンド

VLLM_FLOAT32_MATMUL_PRECISION=high NCCL_P2P_LEVEL=SYS NCCL_P2P_READ_ENABLE=1 vllm serve MiniMaxAI/MiniMax-M3.1-Flash -tp 4 --trust-remote-code --reasoning-parser minimax_m3 --block-size 128 --kv-cache-dtype fp8 --compilation-config '{"cudagraph_mode": "FULL_AND_PIECEWISE"}' --speculative-config '{"method": "dspark", "num_speculative_tokens": 3, "attention_backend": "TRITON_ATTN", "kv_cache_dtype": "auto", "draft_sample_method": "probabilistic"}' --max-num-seqs 32 --max-model-len 262144 --gpu-memory-utilization 0.92 --disable-hybrid-kv-cache-manager

Theoretical memory ceiling

This mixture-of-experts model doesn't list how many parameters are used per token, so a ceiling can't be estimated.

モデル

GPU
RTX PRO 6000 Blackwell Max-Q Workstation Edition
数
4
VRAM
96 GB
OS
Ubuntu 26.04.1 LTS

エンジン

エンジン
vllm
バージョン
0.1.dev23341+g8744dd2fb.d20261022.cu134
Build
vllm/vllm-openai@sha256:f5ec69891fb7b855762f40598eea1aa5cad6e4f2f0c2a2f81d270e2bdcd93632
量子化
NVFP4
バックエンド
cuda
TP
4
KVキャッシュ
fp8
GPUメモリ使用率
0.92
プレフィックスキャッシュ
はい
チャンク化プリフィル
はい
最大実行シーケンス数
32
Attn
Triton MSA sparse (SM120 path)
Spec decode
有効

実行設定

コンテキスト
262,144 トークン
深度
0 トークン
バッチサイズ
1
プロンプトトークン
453
プリフィル tok/s
4,893.9 tok/s
出力トークン
2048
リビジョン
9e7ebacac350
メモ
PureTensor lab, tensor-core: 4x RTX PRO 6000 Blackwell Max-Q (325 W) on PCIe 5.0 x16, Threadripper PRO 9975WX, 512 GB DDR5. Host P2P settings (amd_iommu=off, NVIDIA P2P registry keys). CPU in a performance window (boost on, performance governor, C2 off). Day-0 vLLM image vllm/vllm-openai:minimax-m31-flash-x86_64-cu134, pinned by digest. Checkpoint as released (NVFP4 QAT experts, MXFP8 attention, MSA sparse attention), KV cache fp8; on SM120 vLLM selects its Triton MSA sparse-attention path and the DSpark draft runs on TRITON_ATTN. DSpark draft head from the checkpoint, fixed K=3. Thinking adaptive (the chat template's default; no thinking flag sent). The model's adaptive thinking engaged on this prompt, so the 2,048 output tokens are reasoning text (the decode rate is the same either way). Prefix cache hits were 0: every prompt token was computed cold. Batch 1, temperature 0, streamed; median of 5 runs after 2 warmup(s). 908 verify steps, 2.26 tokens/step, 12.9 ms/step.

投機的デコード

手法
dspark
ステップあたりの採択数
2.26 トークン
採択率
42%
ドラフトトークン
2,724
採択トークン
1,141

記録された証跡

プロンプトハッシュ (SHA-256)
9000edaadb16…
プロンプトサンプル · 1,144 chars
[LocalMaxxing cache-bust nonce: c2f155c58bf411421006cee45cdaa470]
You are helping a small robotics club plan a weekend build. Work through each part carefully and show your reasoning.

1. The club has 7 members and a budget of 412 dollars. A motor driver costs 18.50, a microcontroller 23.75, and each member wants one of each plus a shared 3D-printer spool at 27.90. After buying everything, they split the remainder evenly on batteries priced at 6.35 each. How many batteries can they buy in total, and how much money is left over?

2. Two members disagree about wheel size. Alice says a larger wheel gives more torque at the ground; Ben says it gives more speed. Explain who is right, what tradeoff is actually involved, and how gear ratio changes the answer.

3. Write a short, plain-English procedure (six to nine steps) for safely testing a new motor circuit for the first time, including what to check before applying power.

4. Finally, propose one creative feature for the robot that would be unusual for a club project, and give two concrete risks with how you would mitigate each.

Answer all four parts in order with clear headings.
出力サンプル · 4,000 chars
<mm:think>Let me work through part 1 carefully.

7 members. Each member wants one motor driver ($18.50), one microcontroller ($23.75), and a shared 3D-printer spool ($27.90) — "each member wants one of each plus a shared 3D-printer spool" — so the spool is shared, meaning one spool total (shared among all 7). So costs:

- Motor drivers: 7 × 18.50 = 129.50
- Microcontrollers: 7 × 23.75 = 166.25
- Spool: 1 × 27.90 = 27.90 (shared)

Total = 129.50 + 166.25 = 295.75; + 27.90 = 323.65

Budget 412.00 − 323.65 = 88.35

Batteries at 6.35 each: 88.35 / 6.35 = 13.916... Let's compute: 6.35 × 13 = 82.55. 88.35 − 82.55 = 5.80. So 13 batteries, $5.80 left over.

Check 6.35 × 14 = 88.90 > 88.35. Yes, 13 batteries.

Note: "split the remainder evenly on batteries" — hmm, "they split the remainder evenly on batteries priced at 6.35 each" — meaning they use the remainder to buy batteries. 13 batteries total, $5.80 left. If split evenly among 7 members, 13 batteries can't be split evenly (13/7 ≈ 1.857). So maybe mention: 13 batteries total; if each member gets one, that's 7, leaving 6 extra to distribute (or 2 members get 2 each... 7 + 6 = 13, so 6 members get 2 and 1 gets 1). Actually the question asks "How many batteries can they buy in total, and how much money is left over?" So answer: 13 batteries, $5.80 left. I can note the even-split wrinkle: 13 isn't divisible by 7, so one member gets one battery and six get two, or they save the $5.80.

Let me double-check arithmetic: 18.50 × 7 = 129.50. 23.75 × 7 = 166.25. Sum 295.75. +27.90 = 323.65. 412.00 − 323.65 = 88.35. 88.35/6.35 = 13.9165... 6.35 × 13.9 = 88.265; remainder 0.085/6.35 ≈ 0.0134. So 13.9165. Floor = 13. 13 × 6.35 = 82.55. Leftover 5.80. Good.

Part 2: Wheel size, torque vs speed. Alice says larger wheel gives more torque at the ground; Ben says more speed. Who's right?

Physics: For a motor with a given torque at the shaft and a given RPM, the ground-level torque (force at contact) is T_ground = T_shaft × gear_ratio × efficiency. Wheel radius affects linear speed: v = ω_wheel × r. So a larger wheel at the same wheel RPM gives higher linear speed (Ben is right about speed), but the ground force/tractive force is determined by motor torque and gear ratio, not wheel radius — a larger wheel does NOT increase ground torque for the same motor torque; rather, for the same ground force, a larger wheel requires less motor torque (better mechanical advantage, less rolling resistance/ground pressure). So Alice is wrong in the sense that wheel size doesn't create torque; it converts torque into force with a trade: larger wheel = more speed, less available traction/force for the same motor torque, and worse acceleration/towing ability, more inertia, more clearance needed.

Actually let's be careful: "torque at the ground" — the torque at the ground contact patch. If we define torque at the ground as F × r_wheel, then a larger wheel with the same force gives larger "ground torque" numerically, but that's just a scaling artifact. The meaningful quantity is tractive force F = T_shaft × gear_ratio / r_wheel. So for a fixed motor torque and gear ratio, larger wheel → less force, more speed. So Ben is right about speed; Alice is wrong about torque (larger wheel doesn't give more ground force; it gives more ground torque only in the trivial sense of F×r, which doesn't help).

The real tradeoff: speed vs. traction/force (and acceleration, climbing ability, energy efficiency, ground clearance, weight/inertia, terrain roughness). Bigger wheel: higher top speed for a given RPM, better obstacle crossing, but lower acceleration, more likely to slip/spin, needs more torque to move, more energy to start, larger turning radius, more space.

Gear ratio: gear ratio = N (teeth driven/driving) determines the multiplication of motor torque and division of speed. Higher gear reduction (lower gear ratio number, e.g., 30:1) → more torque at wheel, less speed. Lower reduction (e.g., 10:1) → less torque, more speed. Ge

このハードウェアでのこのモデルの他の実行