속도 테스트모델벤치마크렌탈리포트하드웨어디코드 계산기조직ProAPI 문서제출
언어
Actual Computer — Every computer, one endpoint

속도 테스트

GLM-5.3-Flash-EXL3-TR3-4bpw

GB10 Grace Blackwell 512GB · vllm · EXL3 4.0bpw

Rarri검증됨2026. 9. 25.

디코드

61.5tok/s

프리필

756tok/s

첫 토큰까지의 시간

377ms

합계

91.3tok/s

최대 VRAM

—

컨텍스트 길이

1,000,000

KV 깊이

0

배치 크기

1

동시성

1

소비 전력

—

검증

미검증 — 실험적 결과

검증된 실행은 표준 테스트 프롬프트를 사용하고 결과를 확인할 수 있을 만큼의 데이터를 기록합니다.

  • The speculative decoding stats add up to 446 generated tokens, but the run reports 512.

실행 명령

vllm serve Mia-AiLab/GLM-5.3-Flash-EXL3-TR3-4bpw --served-model-name GLM-5.3-Flash-EXL3 --host 0.0.0.0 --port 8888 --tensor-parallel-size 4 --nnodes 4 --node-rank 0 --master-addr <head-fabric-ip> --master-port 29521 --distributed-executor-backend mp --tool-call-parser glm47 --enable-auto-tool-choice --reasoning-parser glm45 --enable-prefix-caching --no-enable-flashinfer-autotune --quantization exl3 --max-model-len 1000000 --gpu-memory-utilization 0.72 --max-num-seqs 8 --max-num-batched-tokens 7168 --long-prefill-token-threshold 3584 --kv-cache-dtype fp8 --load-format instanttensor --speculative-config {"method":"dflash","model":"/root/.cache/huggingface/hub/models--incoai--GLM-5.3-Flash-DFlash2/snapshots/dc77ff1c99eeb2df044ee3d4f0094eb033fee410","num_speculative_tokens":7,"kv_cache_dtype":"auto","draft_sample_method":"probabilistic","rejection_sample_method":"standard","draft_tensor_parallel_size":4} --chat-template /opt/glm53/chat_template.jinja --limit-mm-per-prompt {"image":48,"video":1} --skip-mm-profiling --kv-cache-memory-bytes 23622320128 --cudagraph-capture-sizes 1 2 3 4 5 6 8 9 10 12 15 16 18 20 21 24 25 30 32 35 40 48 56 64

Theoretical memory ceiling

This mixture-of-experts model doesn't list how many parameters are used per token, so a ceiling can't be estimated.

모델

칩
GB10 Grace Blackwell
메모리
512 GB
OS
Ubuntu 24.04.5 LTS

엔진

엔진
vllm
양자화
EXL3 4.0bpw
TP
4
KV 캐시
fp8
GPU 메모리 사용률
0.72
프리픽스 캐싱
예
프리필 청크
7168
최대 실행 시퀀스
8
Spec decode
활성화됨

실행 설정

컨텍스트
1,000,000 토큰
깊이
0 토큰
배치 크기
1
프롬프트 토큰
285
프리필 tok/s
755.5 tok/s
출력 토큰
512
리비전
25a44fdbf16862a46b7cc9921142c6c81350af2f
메모
4x GB10 (DGX Spark-class: MSI EdgeXpert head + NVIDIA FE + 2x Acer GN100), vLLM tensor-parallel 4 over 200G RoCE through a switch (both CX7 rails, NCCL 4 channels), EXL3 4.0bpw routed experts with FP8 weight-only dense/kda/shared/mla projections (Marlin) and an FP8 (Marlin) lm_head. Routed-expert MoE uses a cooperative fused kernel (fp32 accumulate) on 24 decode/verify row counts between 1 and 64 (per-row-count policy), qualified by a logprob/GSM8K/acceptance gate. Also on: fused MoE routing prep, deferred KDA spec-state store, per-shard greedy verify argmax, sharded drafter top-k, fused DFlash2 conv, MoE router dedup, small-M bf16 GEMM kernel. DFlash2 draft incoai/GLM-5.3-Flash-DFlash2 @dc77ff1c sharded TP 4, up to 7 draft tokens with adaptive-k {2,4,7}. fp8 KV, 1M context (2.03M-token KV pool), max-num-seqs 8, chunked prefill 7168, long-prefill threshold 3584. Head GPU clock floor 2000 MHz (thermal guard L1, GB10 EC power-off protection); workers 2200 MHz. Model default thinking ON, so the measured output tokens are reasoning text. Canonical prompt. Spec counters = vLLM /metrics deltas over the 5 measured requests (warmup outside the window, no other traffic: generation_tokens delta = 5x512), reported as per-request means. Adaptive-k verified a mean 4.13 of up to 7 draft tokens per step, so an accepted + draftTokens/7 estimate undercounts steps; the engine's own per-request counters are consistent: 353.0 accepted + 158.4 verify steps = 511.4 of 512 output tokens.

추측 디코딩

방식
DFlash2
단계당 수락 수
3.23 토큰
수락률
54%
초안 토큰
654
수락된 토큰
353

기록된 증거

프롬프트 해시 (SHA-256)
9000edaadb16…
프롬프트 샘플 · 1,078 chars
You are helping a small robotics club plan a weekend build. Work through each part carefully and show your reasoning.

1. The club has 7 members and a budget of 412 dollars. A motor driver costs 18.50, a microcontroller 23.75, and each member wants one of each plus a shared 3D-printer spool at 27.90. After buying everything, they split the remainder evenly on batteries priced at 6.35 each. How many batteries can they buy in total, and how much money is left over?

2. Two members disagree about wheel size. Alice says a larger wheel gives more torque at the ground; Ben says it gives more speed. Explain who is right, what tradeoff is actually involved, and how gear ratio changes the answer.

3. Write a short, plain-English procedure (six to nine steps) for safely testing a new motor circuit for the first time, including what to check before applying power.

4. Finally, propose one creative feature for the robot that would be unusual for a club project, and give two concrete risks with how you would mitigate each.

Answer all four parts in order with clear headings.
출력 샘플 · 1,665 chars
Let me work through this carefully.

**Part 1: Budget calculation**

7 members, budget $412.
Each member wants one motor driver ($18.50) and one microcontroller ($23.75). Plus a shared 3D-printer spool at $27.90.

Per-member cost: 18.50 + 23.75 = 42.25
For 7 members: 42.25 × 7 = 295.75
Plus spool: 295.75 + 27.90 = 323.65

Remainder: 412 − 323.65 = 88.35

Batteries at $6.35 each: 88.35 / 6.35 = ?

6.35 × 13 = 82.55
6.35 × 14 = 88.90 — that's more than 88.35, so 13 batteries.

Leftover: 88.35 − 82.55 = 5.80

So 13 batteries, $5.80 left over.

Let me double-check: 6.35 × 13: 6 × 13 = 78, 0.35 × 13 = 4.55, total 82.55. Yes. 88.35 − 82.55 = 5.80. Correct.

**Part 2: Wheel size, torque vs speed**

This is a classic physics/engineering question. The key insight: with a given motor and gear ratio, the wheel's angular velocity is fixed (motor speed through gearing). Ground speed = ω × r, so a larger wheel radius gives more speed at the same RPM. Torque at the ground: wheel torque = motor torque × gear ratio; force at ground = torque / r. So a larger wheel gives LESS force at the ground for the same wheel torque (longer lever arm). So Ben is right about speed; Alice is wrong if the motor and gearing are unchanged — larger wheel reduces ground force (torque at contact patch).

However, there's nuance: "torque at the ground" — the torque at the axle is unchanged by wheel size, but the force at the ground (which is what pushes the robot, climbs obstacles, accelerates) is torque/r. So larger wheel = less push force. Tradeoff: speed vs force (and also obstacle climbing — larger wheels roll over obstacles better, ground clearance, but more inertia, more

이 하드웨어에서 이 모델의 다른 실행