속도 테스트
microsoft_Phi-4-mini-instruct-GGUF
Ryzen AI Max 395 96GB · llama.cpp · b11901 · Q4_K_M
디코드
77.6tok/s
프리필
1.7ktok/s
첫 토큰까지의 시간
157ms
합계
153tok/s
최대 VRAM
—
컨텍스트 길이
2K
KV 깊이
0
배치 크기
1
동시성
1
소비 전력
—
검증
검증된 실행실행 명령
llama-server -m microsoft_Phi-4-mini-instruct-Q4_K_M.gguf -ngl 99 -fa on -c 40960 -np 1 --jinja
Theoretical memory ceiling
101.3–102.7 tok/s
256 GB/s memory bandwidth (spec sheet) · 2.49 GB model weights · 16-bit KV cache · 1–269 tokens of context
76–77%
of the ceiling reached
High confidenceThe fastest this hardware's memory could serve a single request; real runs are slower. Model details from microsoft/Phi-4-mini-instruct; size from bartowski/microsoft_Phi-4-mini-instruct-GGUF/microsoft_Phi-4-mini-instruct-Q4_K_M.gguf. Hardware source · Open calculator
모델
- 칩
- Ryzen AI Max 395+
- 메모리
- 96 GB
- OS
- Ubuntu 24.04
엔진
- 엔진
- llama.cpp
- 버전
- b11901
- Commit
- 5320c87ff
- 양자화
- Q4_K_M
- 백엔드
- vulkan
- GPU 레이어
- 99
- Flash Attn
- 예
실행 설정
- 컨텍스트
- 2,048 토큰
- 깊이
- 0 토큰
- 배치 크기
- 1
- 프롬프트 토큰
- 269
- 프리필 tok/s
- 1,701.0 tok/s
- 출력 토큰
- 256
- 메모
- llama.cpp b11901 (Vulkan), the control for the Loculus Core 41dbe1f run on the same machine and the same GGUF file. AMD Ryzen AI Max+ 395 (Radeon 8060S), 96 GB unified memory, Ubuntu 24.04, Vulkan. lmx 0.1.56 remote mode against the engine's own OpenAI-compatible server on the same machine: canonical reasoning-v1 with a per-request cache-bust nonce, temperature 0, 1 warmup + 3 timed requests, median. Submitted by the Loculus Core team (https://loculuscore.com); Loculus Core is in pre-release testing.
기록된 증거
- 프롬프트 해시 (SHA-256)
- 9000edaadb16…
프롬프트 샘플 · 1,144 chars
[LocalMaxxing cache-bust nonce: 0f726cbe86b07367fed9cf3a4e02a45d] You are helping a small robotics club plan a weekend build. Work through each part carefully and show your reasoning. 1. The club has 7 members and a budget of 412 dollars. A motor driver costs 18.50, a microcontroller 23.75, and each member wants one of each plus a shared 3D-printer spool at 27.90. After buying everything, they split the remainder evenly on batteries priced at 6.35 each. How many batteries can they buy in total, and how much money is left over? 2. Two members disagree about wheel size. Alice says a larger wheel gives more torque at the ground; Ben says it gives more speed. Explain who is right, what tradeoff is actually involved, and how gear ratio changes the answer. 3. Write a short, plain-English procedure (six to nine steps) for safely testing a new motor circuit for the first time, including what to check before applying power. 4. Finally, propose one creative feature for the robot that would be unusual for a club project, and give two concrete risks with how you would mitigate each. Answer all four parts in order with clear headings.
출력 샘플 · 879 chars
### 1. Budgeting for Motors, Microcontrollers, and Batteries First, let's calculate the total cost of the motors and microcontrollers for the 7 members: - Motor driver cost per unit: $18.50 - Microcontroller cost per unit: $23.75 - Total cost for one member (motor + microcontroller): $18.50 + $23.75 = $42.25 - Total cost for 7 members (7 * $42.25): $295.75 Next, we add the cost of the shared 3D-printer spool: - 3D-printer spool cost: $27.90 Now, we subtract the total cost of motors, microcontrollers, and the spool from the budget to find out how much money is left for batteries: - Remaining budget: $412 - ($295.75 + $27.90) = $412 - $323.65 = $88.35 Finally, we divide the remaining budget by the cost of one battery to find out how many batteries they can buy: - Battery cost per unit: $6.35 - Number of batteries they can buy: $88.35 / $6.35 ≈ 13.89 Since they
이 하드웨어에서 이 모델의 다른 실행
- 85.5tok/scustom · Loculus Core 9abb6a6 · Q4_K_M컨텍스트 2K · 깊이 0 · 배치 1검증된 실행loculus-core · 2026. 11. 22.
- 85.0tok/scustom · Loculus Core d91e338 · Q4_K_M컨텍스트 2K · 깊이 0 · 배치 1검증된 실행loculus-core · 2026. 11. 10.
- 83.8tok/scustom · Loculus Core 41dbe1f · Q4_K_M컨텍스트 2K · 깊이 0 · 배치 1검증된 실행loculus-core · 2026. 10. 30.
- 82.5tok/scustom · Loculus Core 0baf389 · Q4_K_M컨텍스트 2K · 깊이 0 · 배치 1검증된 실행loculus-core · 2026. 11. 3.